Project: DR_DAVE'S_RV-10   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:DAVE LEHMAN   -  
Project:   Vans - RV-10   -   VIEW REPORTS
Total Hours:452.1
Total Flight Time:
Start/Last Date:Oct 01, 2020 - Feb 03, 2026
 
Friendly URL: https://eaabuilderslog.org?s=DR_DAVE'S_RV-10

Home or Last Project Picture

Aug 13, 2023     Elevator Assembly - Continued       Category: Tail Feathers
Ok. Back to the project. Used long bucking bar to install rivets on the rear spar of elevator. Not an issue at all, #3 rivet gun @ 37PSI. Used PVC pipe on pop- rivet squeezer for leverage on inner LP4-3 blind rivets. Rear spar LP4-3 bilnd rivets were easy with the Harbor Fright Pneumatic Squeezer. Front Spar a little difficulty with rolling rivets (mostly cosmetic, sorry Tony B) I think we need to use other longer dies for the pneumatic squeezer as I suspect the long travel may be the issue.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.